OSHA 1926 applied from the superintendent's chair — the Focus Four, the trigger numbers for excavations, ladders, scaffolds, steel erection and formwork, cranes and lift planning, the competent person's role, and the reporting clocks — plus the non-OSHA safety rules the outline names: asbestos, lead paint, mold, and hazardous waste. It is the single largest Project Management domain (about one question in five) and, like the Business & Finance safety domain, it is tested through numbers and definitions.

What the exam asks

  • The Focus Four hazards and the competent person's two tests: can identify hazards, and has authority to correct them.
  • Trigger numbers: 5 ft excavations, 4 ft egress, 4:1 ladders, 15 ft steel erection fall protection, 20 ft crane power-line clearance.
  • Reporting clocks: fatality in 8 hours, hospitalization, amputation or eye loss in 24 hours.
  • Crane load charts, radius and the written lift plan.
  • Asbestos and lead rules in 1926, plus mold, lead renovation and hazardous waste, which are memory questions outside 1926.

Part 1 of 5

What kills workers and who is responsible

Safety on this exam starts with where the deaths happen and who on the site has the authority to stop work. Both ideas come back in every other section.

The Focus Four kill the most workers

Falls, struck-by, caught-in/between, and electrocution account for the majority of construction fatalities. Safety programs, toolbox talks, and inspections concentrate there — with falls historically the leading killer and the 6-foot fall protection rule the front line.

The competent person runs site safety

A competent person can identify existing and predictable hazards AND has authority to take prompt corrective action (1926.32). One must classify soil and inspect excavations daily and after rain, and inspect scaffolds before each shift and after any event affecting structural integrity.

In your books: Scenario questions still resolve to a printed number or the competent-person definition (1926.32). Find the number; don't reason from memory.

Part 2 of 5

Excavations, ladders, silica and reporting

These are the everyday trigger numbers. Most are a depth, a ratio or a clock, so the exam asks for the number itself. Silica is the exception: the question is which control comes first.

Excavation and ladder numbers

Excavations 5 feet or deeper need a protective system (sloping, benching, shoring, shielding) unless entirely in stable rock; egress within 25 feet of lateral travel at 4 feet deep. Extension ladders set at 4:1 (a 20-ft support height puts the base 5 ft out) and extend 3 feet above the landing.

Work it: Extension ladder setup

Base distance = Support height ÷ 4

ft

Base distance from the wall (4 up to 1 out)

20 ft ÷ 4 equals 5.0 ft

Engineering controls and the reporting clock

OSHA's silica standard requires engineering controls first — wet cutting with integrated water delivery, not dust masks and fans. When incidents happen: fatalities reported to OSHA within 8 hours; in-patient hospitalizations, amputations, and eye losses within 24 hours (1904.39).

In your books: Tab Subpart L scaffolds, Subpart P excavations and Subpart X ladders. Your existing tab set works on this exam too.

Part 3 of 5

Cranes and lift planning

Crane questions turn on three things: how capacity falls with radius, how close the line can be, and what the written plan must carry.

Cranes: the chart, the line, and the plan

Capacity falls as the radius grows because the overturning moment (load × radius) grows; the operator deducts rigging and block from the chart and sets outriggers on firm, cribbed ground. Default power-line clearance is 20 feet for lines up to 350 kV unless specified measures are used. Operators are certified by an accredited body AND evaluated by the employer; a written lift plan carries the load weight, radii, configuration, percent of capacity, rigging, and ground conditions.

Work it: Overturning moment

Overturning moment = Load × Radius

lb
ft
ft

Moment at the short radius

6,000 lb × 30 ft equals 180,000 ft-lb

Moment at the long radius, same load

6,000 lb × 60 ft equals 360,000 ft-lb

In your books: Cranes are Subpart CC (1926.1400 to .1442). Tab it. It is not where the Business & Finance tabs go.

Part 4 of 5

Steel, concrete and precast

Each of these trades has its own numbers, and they differ from the general rules. Fall protection at 15 feet for steel is the classic trap.

Steel, concrete, and precast have their own numbers

Steel erection fall protection triggers at 15 feet (not 6), every column needs four anchor rods, and bar joists carry no load until bridging is in. Forms and shores come out only when the concrete has the strength the specifications or tests show. Tilt-up lifting inserts must hold 2× the load (4× for other precast, 5× for the hardware), and panels stay braced until permanently connected.

In your books: Steel erection is Subpart R (1926.750 to .761) and concrete and masonry is Subpart Q (1926.700 to .706). Tab both.

Part 5 of 5

Asbestos, lead, mold and hazardous waste

The outline names safety rules that are not in 1926 at all. Know who identifies the hazard, who is licensed to handle it and where the waste goes.

Asbestos, lead, mold, and hazardous waste

Before renovation or demolition the owner identifies asbestos-containing material and tells the contractor; Class I work (thermal system insulation, surfacing) is the most regulated, and Florida requires licensed asbestos contractors and advance notification. OSHA's lead standard presumes high exposure for torch cutting, abrasive blasting, and demolition until air sampling proves otherwise; EPA's RRP rule covers pre-1978 housing. Mold is a moisture problem first, and Florida licenses mold assessors and remediators above a size threshold. Solvents and paint waste go to a licensed hazardous waste hauler, never the dumpster or the pond.

In your books: Asbestos is 1926.1101 and lead is 1926.62, so tab both. Mold, lead renovation (EPA RRP) and hazardous waste are not in 1926. Learn them from the Commercial Construction text and the explanations.

Know these cold

The short list to have in your head on exam day. Every line is also a card in your flashcards.

Focus Four
Falls, struck-by, caught-in/between, electrocution
Excavation protective system
Required at 5 ft unless stable rock — 1926.652
Ladder setup
4:1 ratio; rails extend 3 ft above the landing — 1926.1053
Scaffold inspection
Competent person, before each shift and after any integrity-affecting event — 1926.451
Reporting
Fatality 8 hours; hospitalization/amputation/eye loss 24 hours — 1904.39
Silica control
Engineering controls first: wet methods or dust collection — 1926.1153
Crane power-line clearance
20 ft default up to 350 kV — 1926.1408
Steel erection fall protection
15 ft trigger; connectors 15–30 ft — 1926.760
Column anchorage
Minimum 4 anchor rods per column — 1926.755
Tilt-up lifting inserts
2× max intended load (4× other precast, 5× hardware) — 1926.704
Asbestos work classes
Class I = thermal system insulation & surfacing — 1926.1101

Where it lives in your books

The real exam is open book. Knowing which book and which tab answer this topic is worth as much as memorizing it.

Reading isn't learning. Retrieval is.

57 questions in this domain, each with an explanation and source.