Environmental & Site Regulations (NPDES, lead, asbestos, Sunshine 811)
The federal and Florida environmental rules the Business & Finance outline tests under 'Complying with Government Regulations': NPDES construction stormwater permits (Clean Water Act), the EPA Lead Renovation, Repair and Painting Rule, the asbestos NESHAP, Section 404 wetland permits, and Florida's Sunshine 811 call-before-you-dig law (Chapter 556).
9 questions in our bank cite this reference.
Short answer
Environmental & Site Regulations (NPDES, lead, asbestos, Sunshine 811): The federal and Florida environmental rules the Business & Finance outline tests under 'Complying with Government Regulations': NPDES construction stormwater permits (Clean Water Act), the EPA Lead Renovation, Repair and Painting Rule, the asbestos NESHAP, Section 404 wetland permits, and Florida's Sunshine 811 call-before-you-dig law (Chapter 556). Our tab set marks 5 spots in book order, from NPDES construction stormwater (40 CFR 122.26 / FDEP CGP) to Call before you dig (FS 556). 9 of our practice questions cite it.
The one thing to know
These are concept-and-threshold questions, not lookup questions: one acre (NPDES), pre-1978 housing (lead RRP), 10 working days' notice (asbestos), two full business days (811). None of these texts is in the exam room.
Your tab set
Florida exams allow pre-tabbed, highlighted references. Place these tabs before exam day, in book order, and tick them off here.
0 of 5 tabs placed
- 1NPDES construction stormwater40 CFR 122.26 / FDEP CGP
One-acre threshold, Notice of Intent, SWPPP, inspections, Notice of Termination
- 2Lead RRP Rule40 CFR 745
Pre-1978 housing, firm and renovator certification, Renovate Right pamphlet, lead-safe work practices
- 3Asbestos NESHAP40 CFR 61 Subpart M / FS 469
Pre-demolition survey, 10-working-day notice, licensed abatement
- 4WetlandsClean Water Act §404
Army Corps dredge-and-fill permit plus the state environmental resource permit
- 5Call before you digFS 556
Sunshine 811, two full business days' notice, ticket validity
Highlight the question, underline the answer
Don't just tab your books — mark them as you practice. Every time a question sends you into a reference, leave a two-part mark behind: highlight the passage the question is about, and underline the exact words that answer it. Do this through your whole question bank and the book turns into a map of the tested material — so on exam day you recognize the spot, not just the section.
- 1
Highlight what the question asks about
When you look up a practice question, highlight the sentence or table the question turns on. That block is now a visual landmark you'll spot on a fast flip.
- 2
Underline the exact answer
Inside the highlight, underline the specific number, deadline, or phrase that is the answer — with a fine-tip pen. Highlight = the topic; underline = the fact.
- 3
Color-code by what trips you up
Use one highlighter color for deadlines and numbers, another for definitions, a third for the answers you got wrong twice. Your weak spots become the brightest marks in the book.
- 4
Let your tabs and marks compound
A tab gets you to the chapter; the highlight gets you to the paragraph; the underline gets you to the answer. Built up across a full question bank, that three-layer trail is the open-book skill the exam actually tests.
The reference lists allow underlining with pen or highlighter, bar handwritten and typewritten notes in the books, and bar making any marks during the exam — so every mark goes in before you walk in, and none of them can be written notes.
Navigating under time pressure
- NPDES coverage is needed at one acre of disturbance (or any part of a larger common plan that disturbs an acre); Florida DEP runs the program under EPA delegation, and coverage ends with a Notice of Termination at final stabilization.
- The SWPPP is the living document: controls in before soil is disturbed, inspected on the permit's schedule, inspections written down.
- Lead RRP applies to renovations that disturb paint in pre-1978 housing and child-occupied facilities; the firm and the renovator are both certified, and records are kept 3 years.
- Demolition of a commercial building needs an asbestos survey and written notice to the state at least 10 working days before work starts.
Frequently asked questions
How should I tab Environmental Rules for the exam?
These are concept-and-threshold questions, not lookup questions: one acre (NPDES), pre-1978 housing (lead RRP), 10 working days' notice (asbestos), two full business days (811). None of these texts is in the exam room. Build the 5-tab set on this page before exam day, in book order, with permanent tabs that carry only the section heading; movable flags and written notes are not allowed in the exam room.
How do I find answers in Environmental Rules quickly?
NPDES coverage is needed at one acre of disturbance (or any part of a larger common plan that disturbs an acre); Florida DEP runs the program under EPA delegation, and coverage ends with a Notice of Termination at final stabilization. The SWPPP is the living document: controls in before soil is disturbed, inspected on the permit's schedule, inspections written down. Lead RRP applies to renovations that disturb paint in pre-1978 housing and child-occupied facilities; the firm and the renovator are both certified, and records are kept 3 years. Demolition of a commercial building needs an asbestos survey and written notice to the state at least 10 working days before work starts.