Florida Building Code — Test Protocols for High Velocity Hurricane Zones

The TAS (Testing Application Standards) protocols the Florida Building Code requires for roofing products and assemblies in the High-Velocity Hurricane Zone (Miami-Dade and Broward): uplift testing, wind-driven rain, tile attachment, metal and membrane tests, and field uplift testing of installed roofs.

Short answer

Florida Building Code — Test Protocols for High Velocity Hurricane Zones is on the Florida Roofing Trade Knowledge approved reference list in the 2023 edition. Our tab set marks 6 spots in book order, from TAS index & scope to Wind-driven rain & impact.

On the state's approved list

The list entry this guide covers, in the printing the answer key follows. Check the cover before you tab.

  • Florida Building Code — Test Protocols for High Velocity Hurricane Zones2023

    Florida Building Commission / ICC

    Buy: ICC store

Editions match the DBPR reference lists (valid January 2026 – December 2026). Last checked September 25, 2026. Every question is reviewed by a Florida-licensed contractor who holds Certified Building and Class A HVAC licenses and has passed the state General Contractor exams.

The one thing to know

You will not be asked to run a test; you will be asked which protocol applies and what it proves. Tab the index of TAS numbers and read the scope paragraph of each roofing protocol.

Your tab set

Florida exams allow pre-tabbed, highlighted references. Place these tabs before exam day, in book order, and tick them off here.

Print tab labels

0 of 6 tabs placed

  1. 1
    TAS index & scope

    Which protocol applies to which product or assembly

  2. 2
    Roof assembly uplift

    Laboratory uplift resistance testing of membrane and insulation assemblies

  3. 3
    Tile attachment

    Mechanical, mortar and adhesive-set tile uplift and attachment tests

  4. 4
    Fasteners & withdrawal

    Fastener withdrawal resistance in decks, corrosion requirements

  5. 5
    Field uplift testing

    Testing installed roofs in place: bonded pull and negative-pressure methods

  6. 6
    Wind-driven rain & impact

    Water infiltration and impact resistance tests for roofing components

Highlight the question, underline the answer

Don't just tab your books — mark them as you practice. Every time a question sends you into a reference, leave a two-part mark behind: highlight the passage the question is about, and underline the exact words that answer it. Do this through your whole question bank and the book turns into a map of the tested material — so on exam day you recognize the spot, not just the section.

  1. 1

    Highlight what the question asks about

    When you look up a practice question, highlight the sentence or table the question turns on. That block is now a visual landmark you'll spot on a fast flip.

  2. 2

    Underline the exact answer

    Inside the highlight, underline the specific number, deadline, or phrase that is the answer — with a fine-tip pen. Highlight = the topic; underline = the fact.

  3. 3

    Color-code by what trips you up

    Use one highlighter color for deadlines and numbers, another for definitions, a third for the answers you got wrong twice. Your weak spots become the brightest marks in the book.

  4. 4

    Let your tabs and marks compound

    A tab gets you to the chapter; the highlight gets you to the paragraph; the underline gets you to the answer. Built up across a full question bank, that three-layer trail is the open-book skill the exam actually tests.

The reference lists allow underlining with pen or highlighter, bar handwritten and typewritten notes in the books, and bar making any marks during the exam — so every mark goes in before you walk in, and none of them can be written notes.

Navigating under time pressure

  • Protocols are numbered TAS 1xx: the roofing-specific ones cover product approval testing, tile uplift and attachment, fastener withdrawal, and field uplift testing of installed roofs.
  • The code's HVHZ roofing sections (FBC — Building Chapter 15, 1512 onward) name the TAS each product or assembly must meet; start in the code and follow the reference.
Exam domains this book answers

Frequently asked questions

Which edition of Florida Building Code — Test Protocols for High Velocity Hurricane Zones does the Florida exam use?

The 2023 edition, per the DBPR list for the Roofing Trade Knowledge exam. The answer key follows that printing.

How should I tab HVHZ Test Protocols for the exam?

You will not be asked to run a test; you will be asked which protocol applies and what it proves. Tab the index of TAS numbers and read the scope paragraph of each roofing protocol. Build the 6-tab set on this page before exam day, in book order, with permanent tabs that carry only the section heading; movable flags and written notes are not allowed in the exam room.

How do I find answers in HVHZ Test Protocols quickly?

Protocols are numbered TAS 1xx: the roofing-specific ones cover product approval testing, tile uplift and attachment, fastener withdrawal, and field uplift testing of installed roofs. The code's HVHZ roofing sections (FBC — Building Chapter 15, 1512 onward) name the TAS each product or assembly must meet; start in the code and follow the reference.