Wood, Metal & Innovative Framing
15% of this examThree framing systems and the innovative ones: wood (lumber grades and sizes, span tables, trusses per BCSI, rafters, sheathing, fasteners and wind connectors), metal (W-shapes, bolting and welding, erection and plumbing, bar joists, pre-engineered buildings, light-gauge studs, coatings and fireproofing), and tilt-up, SIPs, ICF, and slip forming. Questions test how to read a designation or table, what holds the structure up during erection, and who may change an engineered member.
What the exam asks
- Reading a lumber size or a span table: actual dimensions, and the four things a table is entered with.
- Wood framing parts and connections: headers, plates, joist hangers, I-joists, ring-shank nails and uplift connectors.
- Truss handling: lifting, bracing the first truss, restraint, and who may repair a damaged member.
- Structural steel: reading a W-shape, bolting and welding, anchor rods, plumbing and bracing during erection.
- Tilt-up, SIPs, ICF and slip forming: what each is and what holds it up before it is complete.
Part 1 of 5
Lumber sizes, tables and wall framing
Most wood questions start with reading something: a nominal size, a span table, a header detail. Get the actual sizes and the table inputs cold, then learn which wall members carry load.
Wood: read the table, respect the truss
A 2×10 is 1 1/2 × 9 1/4 in. Span tables are entered by species/grade, size, spacing, and load. Rafter length is the hypotenuse of run and rise; rafter ties resist thrust, collar ties resist uplift. Trusses are lifted upright with a spreader bar for longer spans, the first truss is braced to the ground, and every later truss is restrained before the next one; no truss is cut or drilled without the truss engineer's repair. Ring-shank nails and rated connectors give the continuous load path Florida's wind provisions require; treated lumber goes wherever wood meets concrete, masonry, or moisture.
Lumber sizes and the span table
Nominal 2-inch lumber is 1 1/2 inches thick. Widths of 6 inches and under lose 1/2 inch (a 2×4 is 3 1/2, a 2×6 is 5 1/2); wider pieces lose 3/4 inch (2×8 is 7 1/4, 2×10 is 9 1/4, 2×12 is 11 1/4). A span table is entered with four things: species and grade, member size, spacing on center, and the loading the table was built for. Miss one and you read the wrong line.
Walls: plates, headers, and blocking
A header carries the joists or trusses over an opening and bears on jack studs; full-height king studs stand beside them. Cripples above the header and below the sill carry no concentrated load. The double top plate laps at corners and intersections to lock the walls together, with its end joints offset. Fireblocking is solid material in concealed spaces at floor and ceiling levels and at soffits, so fire cannot run up a stud bay. It limits paths; it does not make a rated assembly.
Worked examples
- 2×43.5 in
- 2×65.5 in
- 2×87.25 in
over 6 in nominal loses 3/4 in
- 2×109.25 in
- 2×1211.25 in
- Risepitch/12 × run (6/12 × 12 ft = 6 ft)
- Length√(run² + rise²) = √(144 + 36)
- Answer≈ 13.4 ft
In your books: Span tables and the fastening schedule are in the Florida Building Code Residential volume. Tab them.
Part 2 of 5
Floors, wind and treated lumber
Floors, sheathing and connectors are where framing meets the wind. The load path has to run from the roof to the foundation, and the fasteners have to survive the wood they touch.
Floors and engineered lumber
Joist hangers are sized to the joist and nailed in every hole with the nails the manufacturer calls for. Toe-nailing alone is not an approved joist connection. I-joists get their strength from the flanges, so a flange is never cut or notched; the web may be cut only where the manufacturer's hole table allows. Sheathing carries a span rating of two numbers: 32/16 means supports up to 32 inches apart as roof sheathing and 16 inches as subfloor.
Wind: nails, connectors, and the load path
Edge nailing is what makes a sheathed wall work as a shear wall, and Florida's wind zones usually tighten the code's fastening schedule. Ring-shank nails hold sheathing against suction where a smooth nail backs out. Each truss is tied to the top plate with a connector rated for the design uplift, and the plates are tied down through the studs to the foundation. Toe-nails do not do that job. The drawings name the connector.
Treated lumber and its fasteners
Sill plates on concrete, framing near grade, deck and exterior stair framing, and wood against masonry exposed to weather are treated or naturally durable. The treatment corrodes plain steel, so fasteners and connectors touching treated wood are hot-dip galvanized or stainless.
In your books: The fastening schedule (R602.3) and the uplift connection rules are in the Florida Building Code Residential volume.
Part 3 of 5
Trusses during erection
The risky time for a truss is before the sheathing goes on. The exam wants to know what holds the trusses up while they are being set, and who may fix one that is damaged.
Trusses during erection
Most truss collapses happen before the sheathing is on. The first truss is braced to the ground or to a finished part of the building, and each truss after it gets top-chord lateral restraint and diagonal bracing at the spacing BCSI gives for the span. Trusses are lifted upright, never flat, with a spreader bar on longer spans and tag lines to control swing. A damaged or altered truss goes back to the truss engineer for a repair detail.
In your books: BCSI is a thin book. Tab lifting, temporary restraint and bracing, and altered trusses, and learn its figures. The exam prints the same pictures.
Part 4 of 5
Structural steel: shapes, connections and erection
Steel questions ask you to read a designation, pick the right connection method, and know what keeps the frame stable while it goes up.
Steel: designations, connections, erection
W18×50 is an 18-inch-deep wide flange at 50 pounds per foot. Snug-tight bolts have the plies in contact; pretensioned bolts are stretched to a verified tension. Welders are qualified by process and position. Columns need four anchor rods; frames are plumbed with cables before final bolting; the braced bay goes up first; bar joists carry nothing until bridging is in. Spray fireproofing gives the frame its hourly rating, galvanizing its corrosion protection. In sheet metal gauge, a smaller number is thicker.
Steel: bolts, welds, deck, and paperwork
Pretensioned bolts are verified by turn-of-nut, a calibrated wrench, twist-off bolts, or direct tension indicators; the drawings say which connections need it. Welders are qualified by test for the process and position under the AWS structural welding code. Headed studs welded through the deck make the slab and beam act together as a composite section. A mill test report gives the chemistry and strength for each heat of steel, and heat numbers tie the paper to the material. Each column base must resist a 300-pound eccentric load at the top of the column.
In your books: Steel erection safety is OSHA Subpart R, and it is tested under framing as well as under safety. The steel and wood chapters (22, 23) are in the Florida Building Code Building volume.
Part 5 of 5
Metal buildings and innovative systems
Pre-engineered buildings, light-gauge studs and coatings come first. Then the newer systems: tilt-up, SIPs, ICF and slip forming, and what keeps each one standing until it is complete.
Metal buildings, light-gauge studs, and coatings
A pre-engineered building is a row of rigid frames. Purlins on the roof and girts on the walls span between frames and carry the panels, and rod or cable bracing in selected bays keeps it square. For light-gauge studs, the lower the gauge number the thicker the steel: 25 and 20 gauge for non-bearing partitions, 18, 16, and 14 for bearing and exterior walls. Hot-dip galvanizing coats every surface in zinc and protects scratches; spray fireproofing or intumescent paint buys steel time in a fire.
Innovative systems
Tilt-up panels cast on the slab are lifted with inserts (2× rated), set, and braced to the slab until the roof diaphragm and connections are complete. SIPs are OSB skins over a foam core; ICF is stay-in-place foam filled with concrete in lifts; slip forming raises a short form continuously for silos, cores, and chimneys.
Worked example
- Tilt-up lifting inserts2 × load
- Inserts in other precast4 × load
- Lifting hardware5 × load
Know these cold
The short list to have in your head on exam day. Every line is also a card in your flashcards.
- Dressed lumber
- 2× = 1 1/2 in; 2×4 = 3 1/2, 2×8 = 7 1/4, 2×10 = 9 1/4, 2×12 = 11 1/4
- W-shape
- W (depth in) × (weight lb/ft)
- Column anchor rods
- Minimum 4 — OSHA 1926.755
- Steel erection fall protection
- 15 ft (connectors 15–30 ft) — 1926.760
- Sheet metal gauge
- Smaller number = thicker (16 ga > 20 ga)
- Truss alteration
- Only with the truss design engineer's repair detail — BCSI
- 2×6 actual
- 1 1/2 × 5 1/2 in (6 in and under lose 1/2 in of width)
- Span table inputs
- Species and grade, size, spacing, load
- Rafter ties vs collar ties
- Rafter ties at the plate resist thrust; collar ties in the upper third resist ridge uplift
- Header bears on
- Jack studs; king studs run full height beside them
- Fireblocking
- Blocks concealed paths at floors, ceilings, soffits — FBC-R R302.11
- I-joist flange
- Never cut or notched; web holes per the manufacturer's table
- Span rating 32/16
- Roof supports up to 32 in; subfloor supports up to 16 in
- Joist hangers
- Every hole filled with the specified nails; toe-nailing alone is not approved
- Treated lumber fasteners
- Hot-dip galvanized or stainless
- Truss lifting
- Upright, spreader bar for longer spans — BCSI B1
- First truss
- Ground-braced before the next one is set — BCSI B1
- Column base
- 4 anchor rods; resists a 300-lb eccentric load at the column top — 1926.755
- Pretension methods
- Turn-of-nut, calibrated wrench, twist-off bolt, direct tension indicator
- Purlins and girts
- Purlins on the roof, girts on the walls, between rigid frames
Where it lives in your books
The real exam is open book. Knowing which book and which tab answer this topic is worth as much as memorizing it.
- Commercial Construction · 15 recommended tabsThis is the Project Management home book. Tab it by trade (site → concrete → masonry → steel → wood → envelope → finishes) so a question about a material sends your hand to one tab, not a table of contents.
- BCSI · 6 recommended tabsBCSI questions are about the first truss and the first hour: how it's lifted, how it's braced before the next one is set, and when the engineer must be called. Tab the temporary-bracing section and the lifting figures.
- Florida Building Code · 18 recommended tabsCode questions give themselves away with words like 'minimum', 'required', or 'permitted'. Go to the code — never answer a code question from memory when the book is on the desk.
- OSHA 1926 · 11 recommended tabsOSHA questions are number questions: heights, depths, distances, and hours. Tab the big subparts and trust the printed number over your memory.