BCSI — Guide to Good Practice for Handling, Installing, Restraining & Bracing of Metal Plate Connected Wood Trusses
The truss industry's jobsite guide (Truss Plate Institute / SBCA): unloading and storing trusses, lifting and spreader bars, temporary restraint and bracing, permanent bracing, and what to do when a truss is damaged or altered.
3 questions in our bank cite this reference.
Short answer
BCSI-ED2-D is on the Florida Contract Administration & Project Management approved reference list in the 2020 edition. Our tab set marks 6 spots in book order, from Jobsite handling & storage (B1) to Damaged, altered & field-cut trusses (B5). 3 of our practice questions cite it.
On the state's approved list
The list entry this guide covers, in the printing the answer key follows. Check the cover before you tab.
- BCSI-ED2-D — Guide to Good Practices for Handling, Installing and Bracing of Metal Connected Wood Trusses2020
Truss Plate Institute
Editions match the DBPR reference lists (valid January 2026 – December 2026). Last checked September 25, 2026. Every question is reviewed by a Florida-licensed contractor who holds Certified Building and Class A HVAC licenses and has passed the state General Contractor exams.
The one thing to know
BCSI questions are about the first truss and the first hour: how it's lifted, how it's braced before the next one is set, and when the engineer must be called. Tab the temporary-bracing section and the lifting figures.
Your tab set
Florida exams allow pre-tabbed, highlighted references. Place these tabs before exam day, in book order, and tick them off here.
0 of 6 tabs placed
- 1Jobsite handling & storageB1
Unloading, stacking and support points, protection from weather, lifting single and bundled trusses
- 2LiftingB1
Spreader bar and tag line rules by truss span; pick points
- 3Temporary restraint & bracingB1 / B2
Ground bracing the first truss, lateral restraint spacing on top chord, bottom chord and web members, diagonal bracing
- 4Permanent bracingB3
Web member permanent bracing, continuous lateral restraint, T- and L-reinforcement
- 5Long-span trussesB7
Trusses over 60 ft — engineer-designed temporary bracing, special handling
- 6Damaged, altered & field-cut trussesB5
Who may approve repairs (the truss design engineer), what counts as an alteration
Highlight the question, underline the answer
Don't just tab your books — mark them as you practice. Every time a question sends you into a reference, leave a two-part mark behind: highlight the passage the question is about, and underline the exact words that answer it. Do this through your whole question bank and the book turns into a map of the tested material — so on exam day you recognize the spot, not just the section.
- 1
Highlight what the question asks about
When you look up a practice question, highlight the sentence or table the question turns on. That block is now a visual landmark you'll spot on a fast flip.
- 2
Underline the exact answer
Inside the highlight, underline the specific number, deadline, or phrase that is the answer — with a fine-tip pen. Highlight = the topic; underline = the fact.
- 3
Color-code by what trips you up
Use one highlighter color for deadlines and numbers, another for definitions, a third for the answers you got wrong twice. Your weak spots become the brightest marks in the book.
- 4
Let your tabs and marks compound
A tab gets you to the chapter; the highlight gets you to the paragraph; the underline gets you to the answer. Built up across a full question bank, that three-layer trail is the open-book skill the exam actually tests.
The reference lists allow underlining with pen or highlighter, bar handwritten and typewritten notes in the books, and bar making any marks during the exam — so every mark goes in before you walk in, and none of them can be written notes.
Navigating under time pressure
- The guide is organized as B-series summary sheets (B1 handling and bracing, B2 truss installation, B3 web member permanent bracing, B7 temporary and permanent restraint for long-span trusses, B10 post-frame). The exam references these by topic, not number.
- Figures carry the answers: spreader-bar lifting, ground bracing of the first truss, lateral restraint spacing, and diagonal bracing patterns.
- Any field cutting, drilling, or notching of a truss, and any truss damaged in handling, requires the truss design engineer's repair detail — not a field fix.
Frequently asked questions
Which edition of BCSI-ED2-D does the Florida exam use?
The 2020 edition, per the DBPR list for the Contract Administration & Project Management exam. The answer key follows that printing.
How should I tab BCSI for the exam?
BCSI questions are about the first truss and the first hour: how it's lifted, how it's braced before the next one is set, and when the engineer must be called. Tab the temporary-bracing section and the lifting figures. Build the 6-tab set on this page before exam day, in book order, with permanent tabs that carry only the section heading; movable flags and written notes are not allowed in the exam room.
How do I find answers in BCSI quickly?
The guide is organized as B-series summary sheets (B1 handling and bracing, B2 truss installation, B3 web member permanent bracing, B7 temporary and permanent restraint for long-span trusses, B10 post-frame). The exam references these by topic, not number. Figures carry the answers: spreader-bar lifting, ground bracing of the first truss, lateral restraint spacing, and diagonal bracing patterns. Any field cutting, drilling, or notching of a truss, and any truss damaged in handling, requires the truss design engineer's repair detail — not a field fix.
Sources
The official publications the editions and rules here trace to. The state's list controls when it differs from anything on this page.