Plans, Specifications & Codes
17% of this examReading construction documents and applying the code: views and sections, line types, symbols and tags, scales, dimension strings, schedules (footing, door, window), contour and site plans, revision clouds, the sheet series, CSI divisions and the three-part section, shop drawings and submittals, and the accessibility numbers. Many questions print a figure; the skill is to read it, then do the arithmetic (areas, risers, ramps, rafter lengths, scaled dimensions).
What the exam asks
- Telling a plan, elevation, section and detail apart, and finding the right sheet by its letter prefix.
- Reading schedules, tags, abbreviations and framing, grading and section drawings.
- Drawing arithmetic: scaled lengths, missing dimensions, L-shaped areas, risers, ramp runs and setbacks.
- Spec layout, submittal types, and what a marked-up submittal does to the contract.
- The accessibility numbers: door width, route width, slopes, reach and parking counts.
Part 1 of 5
Finding your way around the set
A set of plans is built to be searched. Know which sheet holds which kind of information and which view you are looking at before you read a single dimension.
Finding your way around the set
Sheets are lettered by discipline: C civil, L landscape, A architectural, S structural, M mechanical, P plumbing, E electrical, FP fire protection. Structural sheets carry the foundation and framing plans, member sizes, reinforcing, and the general notes that give material strengths. The legend sheet up front explains the project's symbols. Door and window marks point to a schedule; wall type tags point to a wall type legend.
Views, lines, and bubbles
Plans are horizontal cuts from above, elevations are exterior faces, sections are vertical cuts (arrows show the viewing direction), details enlarge. Hidden edges are dashed (footings under a slab). A detail bubble reads detail number over sheet number (5 over A-501). Grid bubbles locate columns; a cloud with a numbered delta marks a revision. Schedules are tables keyed by mark; 'E.W.' means each way.
In your books: The Commercial Construction text's drawings-and-specifications chapter and its symbol tables are the lookup for abbreviations and conventions. The figures in the exam follow the same conventions.
Part 2 of 5
Sections, schedules, framing and site
These are the drawings that describe how the building goes together and where it sits on the lot. Read each one in its proper order, bottom up, top down or high to low.
Reading a section and a schedule
Read a wall section from the bottom up: footing, stem wall or slab edge, treated sill plate, studs, double top plate. A slab detail reads from the top down: slab, welded wire reinforcement, vapor retarder, compacted fill. In a footing schedule, '3 - #5 E.W.' is three bars each way, six bars per footing. A door schedule line gives size, material (HM is hollow metal, WD is wood), frame, fire rating, and hardware set.
Bars per footing = Bars each way × 2
Bars in the footing
3 × 2 equals 6 bars
Framing plans, grids, and truss parts
A beam between grid 2 and grid 3 has a nominal length equal to the grid dimension, center to center of columns; the fabricator takes off the connection setbacks. On a roof framing plan the ridge runs along the top, common rafters run full length from plate to ridge, a hip rafter runs diagonally up from an outside corner, and jack rafters are the short ones that frame into the hip. On a truss, the top chords make the slope, the bottom chord ties the heels and carries the ceiling, and the webs make the triangles.
Site and grading plans
Contour lines join points of equal elevation, and water runs downhill across them at right angles, from the higher contour to the lower. A setback is a minimum distance from the property line: a wall at 23'-6" on a 25-foot setback is 1'-6" too close, and that is far cheaper to catch on the plan than after the slab is poured.
Distance too close = Required setback − Distance to property line
Too close (zero or less means it clears the setback)
25 ft − 23.50 ft equals 1.5 ft
Part 3 of 5
Abbreviations, elevations and the math of a drawing
Most drawing questions end in arithmetic. Use the written dimensions, add and subtract them carefully, and measure with the scale only when nothing is written.
Abbreviations and elevations
A.F.F. is above finished floor. O.C. is on center, TYP. typical, N.T.S. not to scale, V.I.F. verify in field, T.O.S. top of steel, B.O.F. bottom of footing, F.F.E. finished floor elevation. Elevations are heights above a datum, and architectural sets often call the finished floor 100.00, so differences are plain subtraction: a parapet at 124.00 is 24 feet above a floor at 100.00. Use the written dimensions; the scale only matters when you have to measure.
Height above floor = Elevation − Finished floor elevation
High point above the floor
124 ft − 100 ft equals 24 ft
The math of a drawing
Dimension strings add; overall minus known segments gives the missing one. At 1/4" = 1'-0" every quarter inch is a foot (3 1/2 in = 14 ft). Areas of L-shapes are split into rectangles. Risers: total rise ÷ maximum riser, round up, then divide again (108 in ÷ 7 → 16 risers at 6.75 in). Ramps: 1:12 means 12 in of run per inch of rise, 30 in maximum rise per run. Diagonals check square: √(a² + b²).
Missing segment = Overall − Known segments
Missing segment
40 ft − 12 ft − 15 ft equals 13 ft
Actual feet = Measured inches ÷ Inches per foot of scale
Actual length
3.50 in ÷ 0.25 in equals 14 ft
Area = Top rectangle + Lower leg rectangle
Top rectangle
60 ft × 20 ft equals 1,200 SF
Lower leg
(60 ft − 40 ft) × (60 ft − 20 ft) equals 800 SF
Total area
Top + lower leg equals 2,000 SF
Risers = Total rise ÷ Maximum riser, rounded up. Riser height = Total rise ÷ Risers. Treads = Risers − 1.
Risers before rounding up
108 in ÷ 7 in equals 15.4
Treads in the flight
16 − 1 equals 15
Riser height
108 in ÷ 16 equals 6.75 in
In your books: The Commercial Construction text's symbol tables cover the abbreviations. Tab them.
Part 4 of 5
Specifications and submittals
The drawings show what and where. The specifications say what the product is and how it goes in. Submittals are how the contractor proves it before ordering.
Specifications and submittals
CSI MasterFormat: 03 concrete, 04 masonry, 05 metals, 06 wood, 07 thermal & moisture, 08 openings, 09 finishes, 22 plumbing, 23 HVAC, 26 electrical, 31 earthwork. Each section has Part 1 General (submittals, QA), Part 2 Products, Part 3 Execution. Shop drawings are project-specific; product data is the manufacturer's literature; samples are physical. A201 makes the documents complementary and sends conflicts to the architect; a marked-up submittal that changes the design is a change.
How a spec section is laid out
Every section has three parts. Part 1 General is the paperwork: scope, references, submittals, quality assurance, delivery and storage, warranty. Part 2 Products is the materials and their performance. Part 3 Execution is how to install, test, and clean up. Division 01 sets the project-wide procedures. Beyond the low divisions, remember 22 plumbing, 23 HVAC, 26 electrical, 31 earthwork, 32 exterior improvements, 33 utilities.
Submittals, corrections, and hold points
The contractor reviews and stamps shop drawings, product data, and samples before they go to the architect, checking that the products are the specified ones and that fabrication dimensions match the field. The architect reviews for the design concept. If a review comment changes what the contract requires, that is a change, and cost and time move only through the change process. A hold point is a mandatory stop: the next operation waits until the inspector or testing agency releases the work, as with rebar before a pour.
In your books: Submittal rules are A201 section 3.12. The complementary-documents rule is section 1.2.
Part 5 of 5
Code and accessibility lookups
Code questions are mostly lookups, and accessibility questions are mostly numbers. Know the numbers cold and know which volume to open for the rest.
Code and accessibility lookups
Sealed documents from the design professional are the basis of the permit. Sprinkler, egress, and fire-rating questions are occupancy-and-size lookups in the Building volume. Accessibility numbers to know: 32 in clear door width, 36 in accessible route, 1:20 maximum walking slope, 1:12 ramps, 15–48 in reach range, 4 accessible spaces per 76–100 (1 in 6 van).
More accessibility numbers
A ramp run may rise no more than 30 inches before a landing, so a 24-inch rise is one 24-foot run at 1:12. An accessible route may narrow briefly to 32 inches, and its cross slope is limited to 1:48. A flight of stairs has one fewer tread than risers, and the risers in a flight must be uniform. The standard gap between a countertop and the bottom of the wall cabinets on an interior elevation is 18 inches (54 − 36).
Run = Rise × 12 at a 1:12 slope (12 in of run per inch of rise). One run may rise no more than 30 in before a landing.
Run in inches
24 in × 12 in equals 288 in
Run in feet
24 in × 12 in ÷ 12 equals 24 ft
In your books: Accessibility is its own code volume (FBC-Accessibility). Tab ramps (405), doors (404), reach ranges (308), and parking (208).
Know these cold
The short list to have in your head on exam day. Every line is also a card in your flashcards.
- Detail bubble
- Detail number over sheet number
- 1/4-inch scale
- 0.25 in on paper = 1 ft (measured inches ÷ 0.25)
- Riser count
- Total rise ÷ max riser, round UP; one fewer tread than risers
- Ramp slope
- 1:12 max; 30 in max rise per run; 1:20 max for a walking surface
- Door clear width
- 32 in minimum at 90°
- CSI Division 03
- Concrete (04 masonry, 05 metals, 06 wood, 07 thermal & moisture)
- Sheet prefixes
- C civil, A architectural, S structural, M mechanical, P plumbing, E electrical, FP fire protection
- A.F.F.
- Above finished floor
- V.I.F. / N.T.S.
- Verify in field / not to scale
- E.W.
- Each way: '3 - #5 E.W.' is 6 bars per footing
- Section arrows
- Point in the direction the viewer is looking
- Hidden lines
- Dashed; footings below a slab on a foundation plan
- Hip and jack rafters
- Hip runs corner to ridge; jacks frame into the hip
- Truss members
- Top chord, bottom chord, webs
- Contours
- Equal elevation; water crosses them at right angles going downhill
- Spec section parts
- Part 1 General, Part 2 Products, Part 3 Execution
- Divisions 22 / 23 / 26
- Plumbing / HVAC / electrical
- Division 31
- Earthwork (32 exterior improvements, 33 utilities)
- Submittal types
- Shop drawings, product data, samples
- Hold point
- Work stops until the designated inspector releases it
- Cross slope
- 1:48 maximum on an accessible route
- Diagonal check
- √(30² + 40²) = 50 ft; equal diagonals mean square
Where it lives in your books
The real exam is open book. Knowing which book and which tab answer this topic is worth as much as memorizing it.
- Commercial Construction · 15 recommended tabsThis is the Project Management home book. Tab it by trade (site → concrete → masonry → steel → wood → envelope → finishes) so a question about a material sends your hand to one tab, not a table of contents.
- Florida Building Code · 18 recommended tabsCode questions give themselves away with words like 'minimum', 'required', or 'permitted'. Go to the code — never answer a code question from memory when the book is on the desk.
- AIA Documents · 16 recommended tabsA201 article numbers are the map: Art. 3 contractor, Art. 7 changes, Art. 8 time, Art. 9 payments, Art. 11 insurance, Art. 12 corrections, Art. 14 termination, Art. 15 claims. Most Contract Admin questions cite one of these.
Reading isn't learning. Retrieval is.
41 questions in this domain, each with an explanation and source.